Procurement Opportunities

The Procurement function on the West White Rose Project will be undertaken from the Mount Pearl Project office and Argentia Construction Site office. The Procurement objective is to purchase goods or services from technically and commercially acceptable eligible sources that afford the greatest benefit to the Project, taking into consideration cost, risk factors, quality, safety, environmental matters, reliability, delivery, service, total cost of ownership, local content and standardization. The procurement strategy is to purchase the necessary materials, equipment and selected services for the Project through a competitive bidding process. SDP strongly supports providing opportunities to Canadian and, in particular Newfoundland and Labrador companies and individuals, on an overall competitive basis.  The SDP also encourages the participation of members of designated groups (women; Aboriginal peoples; persons with disabilities; and members of visible minorities) and corporations or cooperatives owned by them, in the supply of goods and services.

Registration deadlines are firm and to ensure fair treatment to all those who express interest, registration past the official deadline is prohibited.

Package # Package Title Registration Deadline Projected Award Date Status
30538 Concrete Mix Development Issue Date:05/01/2017
Award Date:05/16/2017
Status:Awarded +

30538 | Concrete Mix Development

Awarded to: Amec
Website: https://www.amecfw.com/

↓ Download Package Information
P-A2201 Concrete Distribution System Issue Date:09/06/2017
Award Date:12/08/2017
Status:Awarded +

P-A2201 | Concrete Distribution System

Awarded to: Pumpcrete Inc.
Website: http://pumpcrete.com/


P-A2102 Tower Cranes Issue Date:02/08/2018
Award Date:04/23/2018
Status:Awarded +

P-A2102 | Tower Cranes

Awarded to: Cropac Equipment Inc.
Website: http://www.cropac.com/en/home

Supply of 3-25 tonne tower cranes and 1-45 tonne luffing tower crane.

*Previous package number P-A2101*


EW-17-00151 Cranes Tower Heavy Lift Issue Date:11/27/2017
Award Date:10/18/2017
Status:Awarded +

EW-17-00151 | Cranes Tower Heavy Lift

Awarded to: ExxonMobil Canada
Website: http://corporate.exxonmobil.com/en


P-A2104 Scaffolding Issue Date:02/27/2018
Award Date:05/25/2018
Status:Awarded +

P-A2104 | Scaffolding

Awarded to: Safway Services Canada Inc.
Website: http://safway.com/

Supply of scaffolding and access materials including design services and management of scaffolding equipment on site. Includes access stair towers, access platforms, support scaffolding and covered drop protection walkways.


S-A2107 Post Tensioning equipment and materials Issue Date:11/08/2017
Award Date:02/09/2018
Status:Awarded +

S-A2107 | Post Tensioning equipment and materials

Awarded to: Vorspann Systems
Website: http://www.vsl.com/

Design, manufacture/supply and installation of all components and materials, including operation/performance of all post-tensioning systems, for the construction of the CGS at the Argentia construction site and trial works.


P-A2204 Formwork for the works (CGS Base Slab) Issue Date:12/07/2017
Award Date:02/13/2018
Status:Awarded +

P-A2204 | Formwork for the works (CGS Base Slab)

Awarded to: Doka Canada Ltd.
Website: https://www.doka.com/

Design and supply of formwork system for the base slab.


P-A2210 Substation Units Issue Date:11/30/2017
Award Date:02/16/2018
Status:Awarded +

P-A2210 | Substation Units

Awarded to: Pennecon Energy Technical Services
Website: http://www.pennecon.com/


P-A2301 Anode Issue Date:12/11/2017
Award Date:02/15/2018
Status:Awarded +

P-A2301 | Anode

Awarded to: Canada Fittings and Flanges Inc.
Website:

Supply of anodes for the CGS. Supply of Material Certifications and Testing.


P-A2302 Fabrication of Major Steel Components (Conductor Frames, Decks, & Guides) Issue Date:01/18/2018
Award Date:04/23/2018
Status:Awarded +

P-A2302 | Fabrication of Major Steel Components (Conductor Frames, Decks, & Guides)

Awarded to: C&W Offshore Ltd
Website: http://www.cwoffshore.com/

Fabrication of Conductor Guides and Frames.Work to include all steel fabrication and coatings. Supply of consumables and coatings. Supply weld procedures and testing.


P-A2303 Fabrication Lower Dome Conductor Guides Issue Date:11/15/2017
Award Date:01/19/2018
Status:Awarded +

P-A2303 | Fabrication Lower Dome Conductor Guides

Awarded to: Pennecon Energy M&M Offshore
Website: http://www.pennecon.com/

Fabrication of Lower dome conductor Guides.Work to include all steel fabrication consumables and coatings. Supply weld procedures and testing.


P-A2304 Deck Connection Casting Issue Date:11/18/2018
Award Date:04/24/2019
Status:Awarded +

P-A2304 | Deck Connection Casting

Awarded to: Sheffield Forgemaster
Website:

The Scope of Supply Includes:

1) Supply of four (4) 25 tonne steel castings for connection of topsides structure. Work to include supply of material certifications and testing.

2) Supply of Marine Appurtenances, Station Keeping System Brackets (Steel Castings) 650 T including pins (forged stainless steel). Four (4) required.

Note, the PT bars and associated hardware are not included in this supply scope.

3) Supply of Pins (forged stainless steel) for 230 T Mooring/Towing Brackets. Thirty-Five (35) required.


P-A2305 Supply & Fabrication of Embedment Plates Issue Date:11/24/2017
Award Date:01/23/2018
Status:Awarded +

P-A2305 | Supply & Fabrication of Embedment Plates

Awarded to: Cahill Fabrication Structural
Website: http://www.cahill.ca/

Fabrication of embedded plates. Work to include all steel fabrication consumables and coatings. Supply weld procedures and testing.


P-A2306 Caisson Roof Formwork Design and Fabrication Issue Date:10/16/2018
Award Date:12/17/2018
Status:Awarded +

P-A2306 | Caisson Roof Formwork Design and Fabrication

Awarded to: Talon Energy Services
Website: http://www.talonenergyservices.ca/

Fabrication of steel trusses, miscellaneous steel and decking for roof falsework. Work to include all steel fabrication and coatings. Supply weld procedures and testing.


P-A2307 Fabrication of Secondary Steel Components Issue Date:03/07/2018
Award Date:04/27/2018
Status:Awarded +

P-A2307 | Fabrication of Secondary Steel Components

Awarded to: Pennecon Energy MMO
Website: https://pennecon.com/

Supply and fabrication of steel manways, pipe supports and guides, equipment skids, equipment guards, external ladders and platforms. Work to include all steel fabrication and coatings. Supply weld procedures and testing.


P-A2309 Rebar Issue Date:10/11/2017
Award Date:12/20/2017
Status:Awarded +

P-A2309 | Rebar

Awarded to: Megasa
Website: http://www.megasa.com/

Supply of bulk steel reinforcement for the construction of the CGS.


P-A2312 Fabrication of Major Steel Components (Shaft supports, stair towers, ballast support structure and walkway) Issue Date:01/17/2018
Award Date:03/07/2018
Status:Awarded +

P-A2312 | Fabrication of Major Steel Components (Shaft supports, stair towers, ballast support structure and walkway)

Awarded to: Pennecon Energy MMO
Website: https://pennecon.com/

Fabrication of support steel work and brackets in the shaft, stair towers, ballast support structure and walkway. Work to include all steel fabrication consumables and coatings. Supply weld procedures and testing.


S-A2313 T-Headed bar Issue Date:11/23/2017
Award Date:02/09/2018
Status:Awarded +

S-A2313 | T-Headed bar

Awarded to: Headed Reinforcement Canada Inc.
Website: https://hrc-canada.com/

Fabrication of steel reinforcement T Headed Bars and couplers for the construction of the CGS. Work to include all cutting, bending and friction welding and rebar threading as required. Supply of Material Certifications and Testing. Rebar supply not in scope.


P-A2501 Fabrication of CGS Ballasting System Issue Date:10/30/2018
Award Date:12/20/2018
Status:Awarded +

P-A2501 | Fabrication of CGS Ballasting System

Awarded to: Cahill Fabrication
Website: https://www.cahill.ca/

Fabrication of piping for various CGS ballasting systems. Work includes all pipe fabrication coatings. Supply of weld procedures and testing.


P-A2504 Hoists (personnel) Issue Date:02/28/2018
Award Date:05/10/2018
Status:Awarded +

P-A2504 | Hoists (personnel)

Awarded to: Leavitt Cranes Canada Inc.
Website: http://www.leavittcranes.com/

Supply of personnel hoists for construction.


P-A2505 J Tubes - Bulk Order for J-Tubes, Steel Caission and Drill Chutes Issue Date:11/15/2017
Award Date:02/06/2018
Status:Awarded +

P-A2505 | J Tubes - Bulk Order for J-Tubes, Steel Caission and Drill Chutes

Awarded to: Canada Fittings & Flanges
Website: http://www.sffgroup.com

Supply of bulk pipe to API standards, supply material certification.


P-A2507 Pipes Supports & Guides Issue Date:04/13/2018
Award Date:07/25/2018
Status:Awarded +

P-A2507 | Pipes Supports & Guides

Awarded to: RothLochston Subsea Inc.
Website: http://www.rothlochstonsubsea.com/

Fabrication of Pipe Supports and Guides. Work to include all steel fabrication, consumables and coatings. Supply weld procedures and testing.


P-A2511 Supply and Fabricate Induction Bends Issue Date:11/16/2017
Award Date:01/31/2018
Status:Awarded +

P-A2511 | Supply and Fabricate Induction Bends

Awarded to: Canada Fittings & Flanges
Website: http://www.sffgroup.com

Supply and Fabrication of Induction Bends. Includes supply of Material Certifications and Testing.


P-A2512 Supply Bulk Order Pipe Issue Date:03/02/2018
Award Date:04/10/2018
Status:Removed +

P-A2512 | Supply Bulk Order Pipe

This package has been removed.

Supply bulk pipe to ASTM standards. Includes supply of Material Certifications and Testing.


P-A2513 Supply Pipe Fittings Issue Date:03/02/2018
Award Date:04/10/2018
Status:Removed +

P-A2513 | Supply Pipe Fittings

This package has been removed.

Supply fittings to ASME standards. Includes supply of Material Certifications and Testing.


P-A2514 Supply Fabricate Steel Girders Issue Date:11/22/2017
Award Date:02/09/2018
Status:Awarded +

P-A2514 | Supply Fabricate Steel Girders

Awarded to: C&W Offshore
Website: http://www.cwoffshore.com/

Supply and Fabrication of Steel Girders. Work to include all steel supply, steel fabrication, consumables and coatings. Supply weld procedures and testing.


P-A2515 Shaft Dewatering Pumps Issue Date:05/25/2019
Award Date:07/03/2019
Status:Removed +

P-A2515 | Shaft Dewatering Pumps

This package has been removed.

Supply of two (2) shaft dewatering pumps. Supply all documentation and testing.


P-A2516 Bulk Order Studs & Gaskets Issue Date:02/20/2019
Award Date:06/03/2019
Status:Awarded +

P-A2516 | Bulk Order Studs & Gaskets

Awarded to: Hydrobolt Ltd, UK
Website: http://www.hydrobolt.co.uk/

Supply of bulk studs and gaskets for CGS piping systems. Supply material certification.


P-A2517 Supply Only Pipe, Fitting’s & Flanges for Ballast System Issue Date:06/29/2018
Award Date:09/17/2018
Status:Awarded +

P-A2517 | Supply Only Pipe, Fitting’s & Flanges for Ballast System

Awarded to: Trouvay and Cauvin
Website:


P-A2520 Supply Fitting for J-Tubes, Steel Caissons and Drill Chutes Issue Date:11/15/2017
Award Date:01/31/2018
Status:Awarded +

P-A2520 | Supply Fitting for J-Tubes, Steel Caissons and Drill Chutes

Awarded to: Canada Fittings & Flanges
Website: http://www.sffgroup.com

Supply fittings to API standards. Includes supply of Material Cerifications and Testing.


S-A2703 Instruments & Monitoring System Issue Date:12/07/2017 Award Date:05/28/2018 Status:Closed +

S-A2703 | Instruments & Monitoring System


P-A2706 Mooring Buoys and Bollards Issue Date:07/02/2019 Award Date:08/30/2019 Status:In Progress +

P-A2706 | Mooring Buoys and Bollards


P-A2707 Navigational Lights Issue Date:07/10/2019 Award Date:08/30/2019 Status:In Progress +

P-A2707 | Navigational Lights


P-A2709 Bulk Order Cable Issue Date:02/25/2019 Award Date:06/30/2019 Status:In Progress +

P-A2709 | Bulk Order Cable

Supply of cables for power and data systems for CGS. Supply material certifications and data sheets.


P-A2710 Bulk Order Cable Tray Issue Date:02/04/2019
Award Date:06/27/2019
Status:Awarded +

P-A2710 | Bulk Order Cable Tray

Awarded to: Oglaend System US LLC
Website:

Supply cable tray for power and data systems for CGS. Supply material certification and data sheets.


P-A2711 Bulk Order Fiberglass Grating Issue Date:09/09/2018
Award Date:10/17/2018
Status:Removed +

P-A2711 | Bulk Order Fiberglass Grating

This package has been removed.

Supply of fiberglass grating for stairs, platforms and walkways.


P-A2712 Bulk Order Paint Issue Date:04/30/2019 Award Date:06/13/2019 Status:In Progress +

P-A2712 | Bulk Order Paint

Supply bulk paint for field painting and touch ups of structural steel and pipe items in CGS.


P-A2716 Supply CGS Grounding Systems Issue Date:12/08/2017
Award Date:06/26/2018
Status:Removed +

P-A2716 | Supply CGS Grounding Systems

This package has been removed.

Package P-A2716 has been cancelled.


S-A2101 Site general services (clean-up, road maintenance, snow removal) Issue Date:01/21/2018
Award Date:03/01/2018
Status:Removed +

S-A2101 | Site general services (clean-up, road maintenance, snow removal)

This package has been removed.
S-A2105 Supply of Slipform Equipment & Supervision Personnel Issue Date:10/14/2017
Award Date:12/11/2017
Status:Awarded +

S-A2105 | Supply of Slipform Equipment & Supervision Personnel

Awarded to: Gleitbau m.b.H
Website: http://gleitbau.com/en/


S-A2108 Concrete Test Lab Issue Date:12/01/2017
Award Date:03/29/2018
Status:Awarded +

S-A2108 | Concrete Test Lab

Awarded to: AMEC Foster Wheeler
Website: https://www.amecfw.com/


S-A2201 Concrete Batch Plants (main CGS concrete package) Issue Date:09/18/2017
Award Date:11/10/2017
Status:Awarded +

S-A2201 | Concrete Batch Plants (main CGS concrete package)

Awarded to: Capital Ready Mix Lafarge Partnership
Website:


S-A8003 Public Relations Consultant Issue Date:11/14/2017
Award Date:12/08/2017
Status:Awarded +

S-A8003 | Public Relations Consultant

Awarded to: National Public Relations
Website: http://www.national.ca/


P-A2530 Bulk Order Structure Steel Issue Date:12/12/2017
Award Date:02/28/2018
Status:Awarded +

P-A2530 | Bulk Order Structure Steel

Awarded to: Trouvay & Cauvin
Website: http://www.trouvaycauvin.com/


S-A8001 Occupational Testing - Site Access Issue Date:10/25/2017
Award Date:12/08/2017
Status:Awarded +

S-A8001 | Occupational Testing - Site Access

Awarded to: Horizon Occupational Health Solutions
Website: https://horizonohs.com/


S-A2102 Site Snow Removal Service Issue Date:11/08/2017
Award Date:12/08/2017
Status:Awarded +

S-A2102 | Site Snow Removal Service

Awarded to: Woodmar Contracting
Website:


S-A8004 Assessment Fire Safety Risk - Barge Mounted Construction Offices Issue Date:10/30/2017
Award Date:12/10/2017
Status:Awarded +

S-A8004 | Assessment Fire Safety Risk - Barge Mounted Construction Offices

Awarded to: LAT 49 Architecture Inc.
Website: http://www.lat49.ca/


S-A8005 Engineering Support Issue Date:11/06/2017
Award Date:12/10/2017
Status:Awarded +

S-A8005 | Engineering Support

Awarded to: SNC-Lavalin Inc.
Website: http://www.snclavalin.com/en/


S-A8006 Port Authority - Building Assessment & Report Issue Date:11/14/2017
Award Date:11/28/2017
Status:Awarded +

S-A8006 | Port Authority - Building Assessment & Report

Awarded to: SNC Lavalin
Website: http://www.snclavalin.com/en/


S-A8007 Dewatering Services Issue Date:10/23/2017
Award Date:11/09/2017
Status:Awarded +

S-A8007 | Dewatering Services

Awarded to: Pennecon Energy
Website: http://pennecon.com/


P-A2109 Radio System Requirements Issue Date:12/21/2017
Award Date:02/02/2018
Status:Awarded +

P-A2109 | Radio System Requirements

Awarded to: Rock Networks
Website: http://rocknetworks.com/

Supply of Site Radio System, Including Talk Paths & Equipment Requirements


P-A2702 Generators (Standby Batch Plant) Issue Date:12/06/2017
Award Date:02/12/2018
Status:Awarded +

P-A2702 | Generators (Standby Batch Plant)

Awarded to: Wajax
Website: https://www.wajax.com/


S-A2310 Rebar Cutting and Forming Issue Date:11/17/2017
Award Date:02/06/2018
Status:Awarded +

S-A2310 | Rebar Cutting and Forming

Awarded to: AGF Steel NL Inc
Website: http://groupeagf.com/en/group/branches/agf-steel-nl-inc

Fabrication of steel reinforcement for the construction of the CGS. Work to include all cutting and bending as well as supply of all rebar chairs. Rebar supply not in scope.


P-A2509 Fabrication of CGS Piping (J-Tubes, Caissons, and Drill Chutes) Issue Date:02/02/2018
Award Date:04/09/2018
Status:Awarded +

P-A2509 | Fabrication of CGS Piping (J-Tubes, Caissons, and Drill Chutes)

Awarded to: Pennecon
Website: https://pennecon.com/

Fabrication of fabrication of CGS piping (J-tubes, caissons, and drill chutes). Work to include all steel fabrication, consumables and coatings. Supply weld procedures and testing.


P-A2110 Survey Equipment Issue Date:01/24/2018
Award Date:02/12/2018
Status:Awarded +

P-A2110 | Survey Equipment

Awarded to: Leica Geosystems Ltd.
Website: https://leica-geosystems.com/

Supply of Site Survey Equipment


S-A8020 Welding Inspection Services Issue Date:02/02/2018
Award Date:02/16/2018
Status:Removed +

S-A8020 | Welding Inspection Services

This package has been removed.

A company with 10 years or more experience in the metallurgic review and/or development of vendor weld procedure specifications and interpreting the results of the associated procedure qualification records. The provider must have a professional engineer registered within the province of Newfoundland and Labrador and have specific training in ASME B31.3, CSA W59, AWS D1.1 and international standards as applicable.

The service provider will be required to review vendor submitted weld procedure specifications and associated procedure qualification records according to the following criteria:

1: Are they acceptable according to the requirements called out in the associated drawings?
2: Do they meet industry standards and codes?
3: Are they acceptable according to the client defined specifications?

If the WPS and PQRs do not meet the criteria, the provider is required to determine what course of action would be required to make them acceptable; i.e. submit a new WPS and PQR, modify the WPS to suit new materials and redo PQR, modify WPS with existing PQR, resubmit WPS with new cover sheet for client, etc.

In the case where the procedures do not meet at least one of the criteria but the provider believes the procedure is superior and could be used as a substitution, they shall prepare a Technical Query which can be submitted to the client to justify the substitution, and be prepared to answer subsequent clarification requests from the client.

Frequency/Budgetary hours: 12-15 hours per week during initial review of procedures, support as required thereafter.


S-A8023 Third Party Quality Surveillance and Inspection Services Issue Date:03/09/2018
Award Date:05/16/2018
Status:Awarded +

S-A8023 | Third Party Quality Surveillance and Inspection Services

Awarded to: Applus Velosi | DNV GL
Website:

Applus Velosi
http://www.applusvelosi.com/en/

DNV GL
https://www.dnvgl.com/


P-A2502 Personnel Baskets for Suspended Platform Issue Date:05/04/2018
Award Date:06/04/2018
Status:Awarded +

P-A2502 | Personnel Baskets for Suspended Platform

Awarded to: Lifting Technologies Inc., USA
Website: http://www.lifttech.com/

Suspended platforms in the form of personnel baskets will be required for installation of access systems. Rental or design/fabricate/supply of units will be assessed to conclude best option. Included in the rental or sale is the suspension system in the form of rigging designed for the tower cranes to be used for the CGS construction and installation.


S-A8026 Hazard Waste Services Issue Date:04/04/2018
Award Date:05/18/2018
Status:Awarded +

S-A8026 | Hazard Waste Services

Awarded to: Pardy's Waste Management and Industrial Services Ltd.
Website: http://www.pardyswaste.com/


S-A8027 Regular Garbage Waste & Recycling Services Issue Date:04/23/2018
Award Date:06/08/2018
Status:Awarded +

S-A8027 | Regular Garbage Waste & Recycling Services

Awarded to: Provincial Ready Mix
Website: www.provincialreadymix.com


S-A8028 Metal Recycling Services Issue Date:05/11/2018
Award Date:07/15/2018
Status:Awarded +

S-A8028 | Metal Recycling Services

Awarded to: Newco Metals and Recycling
Website: http://www.newcometal.com/


S-A8029 NDE-NDT Services Issue Date:05/18/2018
Award Date:10/05/2018
Status:Awarded +

S-A8029 | NDE-NDT Services

Awarded to: Acuren Group Inc
Website:


S-A8017 Slope Stability Study Issue Date:12/10/2017
Award Date:12/21/2017
Status:Awarded +

S-A8017 | Slope Stability Study

Awarded to: Stantec Consulting Ltd.
Website: https://www.stantec.com/en


S-A8031 Weather Forecasting Services Issue Date:05/24/2018
Award Date:08/13/2018
Status:Awarded +

S-A8031 | Weather Forecasting Services

Awarded to: Wood Environment & Infrastructure
Website: https://www.woodplc.com/

The provision of wind and weather forecasting services for the construction project for a Concrete Gravity Structure (CGS), covering the set-up of any required measurement and data gathering systems, and provision of forecasting reports on a daily basis during the duration of the construction activities in the Graving Dock at Argentia.


S-A8032 Supply and Installation of Piezometer Issue Date:06/01/2018
Award Date:06/25/2018
Status:Removed +

S-A8032 | Supply and Installation of Piezometer

This package has been removed.

The provision of services for the drilling, installation and commissioning of a piezometer in the graving dock of the West White Rose Project Site


S-A8033 Trucking of Rebar to / from Argentia and Fabricators Issue Date:05/27/2018
Award Date:06/20/2018
Status:Awarded +

S-A8033 | Trucking of Rebar to / from Argentia and Fabricators

Awarded to: Collins Contracting Ltd.
Website:


P-A2735 Electrical Distribution System Issue Date:07/10/2018
Award Date:04/08/2019
Status:Awarded +

P-A2735 | Electrical Distribution System

Awarded to: Avalon Controls
Website:

SCOPE OF SUPPLY

The scope of supply shall include the detailed engineering, procurement, fabrication, construction, commissioning, preservation, and supply of a fully outfitted electrical cabin. The following is included:

a) Detailed design of the electrical cabin, certified for installation in a non-hazardous area, including heating, lighting, ventilation, fire detection and protection, as well as the detailed layout of all electrical equipment, cable routing and cable tray systems within the cabin envelope.
b) Final selection and sizing of all electrical distribution equipment.
c) Completion of an electrical systems analysis report covering short circuit, coordination, motor starting, and arc flash studies.
d) Procurement of all equipment and materials as required for the supply of the fully outfitted electrical cabin.
e) Fabrication of the electrical cabin.
f) Installation, hook-up and interconnection of all electrical equipment within the envelope of the scope of supply
g) Programming and set-up of all protection relays and devices.
h) Mechanical completion and detailed factory acceptance testing of all equipment and devices, including system integration tests with the ICS (separate package) and diesel generator packages (separate package).
i) Completion of a detailed documentation package covering the full scope of supply.
j) Site assistance in Argentia, NL for the purposes of supporting installation, testing and commissioning.

The work shall be completed in accordance with the Regulatory requirements of the C-NLOPB and in compliance with Canadian and recognized International Codes and Standards. In addition, the supplier shall work with the project nominated Marine Warranty Surveyor and Certifying Authority to ensure that any additional requirements are incorporated into the design and supply of the equipment.

Engineering design shall be performed by an entity that carries permit to practice in the province of Newfoundland and Labrador.

ELECTRICAL DISTRIBUTION EQUIPMENT

The electrical distribution equipment shall include the following items:

a) 600 Volt Primary Distribution Board.
b) 208 Volt Auxiliary Distribution Board.
c) 120/208V Auxiliary Panelboards.
d) UPS Systems including 120V Distribution Panelboards.
e) Small Power Distribution Transformers.
f) Variable Frequency Drives and/or Soft Starters.
g) Neutral Grounding Resistors and Associated Alarm Relays.
h) Interconnecting Cabling, Cable Tray Systems, and Conduit Systems within the Electrical Cabin.
i) Electrical Grounding Equipment.

The equipment is required to be supplied such that all circuit breakers, switches, operating and protection devices shall be capable of communication with the CGS ICS in such a manner that full operation, control, status indication, and fault information is available remotely via the CGS ICS. This includes the ability to open, close, trip, and reset circuit breakers and switches. The equipment shall also have the capability to self-test and perform diagnostic functionality.

ELECTRICAL CABIN

The Electrical Cabin shall include the following hardware elements and equipment:

a) An A60 rated, containerized shelter containing the Electrical Distribution Equipment.
b) All required utilities including receptacles, lighting, emergency lighting, heating, and ventilation.
c) Fire detection and alarms.
d) Fire protection equipment.

The cabin is required to be designed such that it can be transported by road, lifted in place with the use of a crane, and removed in sections not larger than 1.8m x 4.5m x 2.6m high.


S-A2501 Installation Control System Issue Date:07/10/2018
Award Date:03/22/2019
Status:Awarded +

S-A2501 | Installation Control System

Awarded to: Avalon Controls
Website:

SCOPE OF SUPPLY

The scope of supply shall include the detailed engineering, procurement, fabrication, construction, commissioning, preservation, and supply of the fully outfitted Remote Ballasting Station Cabin, the Ballasting Control Cabin, and the ICS control hardware contained within these cabins. The following is included:

a) Detailed design and configuration of control system hardware to receive and process all I/O signals associated with ballasting field instrumentation.
b) Detailed design and configuration of control interfaces with other packages to ensure the communication of all necessary status, alarm, and control signals to enable remote control capability of these packages. The ICS supplier is expected to serve as a system integrator and work jointly with other equipment suppliers to ensure compatibility at interface points.
c) Detailed design and configuration of telemetry system interface to implement remote control capability of all ICS connected equipment from the Remote Ballasting Station.
d) Detailed design and configuration of operator interface screens to monitor and control all aspects of ballasting operations.
e) Detailed design of the Remote Ballasting Station and the Ballast Control Cabin including heating, lighting, ventilation, fire detection and protection, as well as the detailed layout of all equipment, cable routing and cable tray systems.
f) Final selection of all electrical, control and telemetry equipment installed in the RBS and BCC.
g) Procurement of all equipment and materials as required for the supply of the ICS system hardware and the fully outfitted cabins.
h) Fabrication of the RBS and BCC cabins.
i) Installation, hook-up and interconnection of all equipment contained within the cabins.
j) Mechanical completion and detailed factory acceptance testing of all equipment and devices, including system integration tests to test the interface with the equipment supplied by others.
k) Completion of a detailed documentation package covering the full scope of supply.
l) Site assistance in Argentia, NL for the purposes of supporting installation, testing and commissioning. The supply of the Valve Control and Monitoring System and electric actuators may be incorporated within the ICS scope of supply if the bidder has the capability to offer an integrated solution.

The work shall be completed in accordance with the Regulatory requirements of the C-NLOPB and in compliance with Canadian and recognized International Codes and Standards. In addition, the supplier shall work with the project nominated Marine Warranty Surveyor and Certifying Authority to ensure that any additional requirements are incorporated into the design and supply of the equipment.

Engineering design shall be performed by an entity that carries permit to practice in the province of Newfoundland and Labrador.

INSTALLATION CONTROL SYSTEM EQUIPMENT

The Installation Control System equipment shall include the following items:

a) HMI terminals / workstations for the BCC and RBS.
b) Control System Cabinets containing data logging servers, controller, I/O and interface modules (located aboard CGS in BCC).
c) Marshalling Cabinets for CGS field I/O (located aboard CGS in BCC). .
d) Telemetry equipment to implement a redundant communications link between RBS and BCC
e) UPS system in RBS cabin.
f) Remote Ballasting Station Cabin
g) Ballasting Control Cabin.
h) Interconnecting Cabling, Cable Tray Systems, and Conduit Systems (internal to RBS and BCC).

The Valve Control and Monitoring System and electric actuators may optionally be included within the ICS system scope of supply.

REMOTE BALLASTING STATION CABIN

The Remote Ballasting Station Cabin shall include the following hardware elements and equipment:

a) An A60 rated, containerized shelter containing the primary control station ICS hardware and telemetry equipment for remote (Vessel-based) monitoring and control of all ballasting operations.
b) All required utilities including receptacles, lighting, emergency lighting, heating, and ventilation.
c) Fire detection and alarms.
d) Fire protection equipment.

BALLASTING CONTROL CABIN

The Ballasting Control Cabin shall include the following hardware elements and equipment:

a) An A60 rated, containerized shelter containing all CGS-based ICS hardware including marshalling cabinets, control system cabinets, telemetry cabinets, HMI /workstations, datalogging server, suitable for operation in a non-hazardous area.
b) All required utilities including receptacles, lighting, emergency lighting, heating, and ventilation.
c) Fire detection and alarms.
d) Fire protection equipment.

The cabin is required to be designed such that it can be transported by road, lifted in place with the use of a crane, and removed in sections not larger than 1.8m x 4.5m x 2.6m high.


P-A2510A (Manual Valves) Valve Actuation System Issue Date:07/10/2018
Award Date:04/30/2019
Status:Awarded +

P-A2510A (Manual Valves) | Valve Actuation System

Awarded to: Score Canada Ltd
Website:

SCOPE OF SUPPLY

The scope of supply shall include the detailed engineering, procurement, fabrication, commissioning, preservation, and supply of the ballast system valves fully outfitted with the electric actuators and the Valve Control and Monitoring System (VCMS). The following is included:

a) Supply of ballast valves complete with ISO 13628-8 class 4 mechanical interface for mounting the actuators.
b) Final selection and sizing of electric actuators.
c) Detailed design and configuration of VCMS local control panel operator interface screens to monitor and control the ballasting valves.
d) Detailed design of the VCMS, including redundant control system for the electric actuators, local control panel, and marshalling system to accommodate the transition from subsea rated cables from the actuators to the marine cables connecting to the VCMS cabinet.
e) Detailed design and configuration of control interfaces with the ICS to ensure the communication of all necessary status, alarm, and control signals to enable remote control capability of the ballasting valves via the ICS.
f) Procurement of all equipment and materials as required for the supply of the ballast valves, actuators, and VCMS cabinet.
g) Mechanical completion and detailed factory acceptance testing of all equipment and devices, including system integration tests to test the interface with the ICS.
h) Completion of a detailed documentation package covering the full scope of supply.
i) Site assistance in Argentia, NL for the purposes of supporting installation, testing and commissioning.

The supply of the Valve Control and Monitoring System and electric actuators may be incorporated within the ICS scope of supply if the bidder has the capability to offer an integrated solution.

The work shall be completed in accordance with the Regulatory requirements of the C-NLOPB and in compliance with Canadian and recognized International Codes and Standards.

Engineering design shall be performed by an entity that carries permit to practice in the province of Newfoundland and Labrador.

VALVE ACTUATION EQUIPMENT

The Valve Actuation equipment shall include the following items:

a) Subsea rated electric valve actuators for all actuated CGS ballasting valves, approximate quantities as per Table D1.
b) Supply of actuated and non-actuated valves (full bore ball valves and triple offset (TOS) butterfly type), approximate quantities as per Table D1.
c) Valve Control and Monitoring System cabinet(s) containing the local control panel HMI, ICS interface, and redundant actuator controllers, power supplies, and communications.
d) Marshalling system for the transition between subsea cable system and the VCMS cabinet.
e) Subsea cabling, connectors and junction boxes for installation between the actuators and the marshalling enclosure(s)


P-A2730 Electrical Power Generation Issue Date:07/10/2018
Award Date:04/01/2019
Status:Awarded +

P-A2730 | Electrical Power Generation

Awarded to: Cahill Technical Services
Website: cahill.ca

SCOPE OF SUPPLY

The scope of supply shall include the design, fabrication, performance testing and delivery to site of the following:

a) 2 off 600V, 3ph, 650kW (estimated) diesel powered generators
b) 2 off 208V, 3ph, 75kW (estimated) diesel powered generators
c) 1 off diesel storage and transfer skid
d) Detailed design and configuration of control interfaces with the ICS to ensure the communication of all necessary status, alarm, and control signals to enable remote control capability of the generators via the ICS.
e) Mechanical completion and detailed factory acceptance testing of all equipment and devices, including system integration tests to test the interface with the ICS.
f) Completion of a detailed documentation package covering the full scope of supply.
g) Site assistance in Argentia, NL for the purposes of supporting installation, testing and commissioning.

The work shall be completed in accordance with the Regulatory requirements of the C-NLOPB and in compliance with Canadian and recognized International Codes and Standards and the generators shall be suitable for operation in a non-hazardous area.

Engineering design shall be performed by an entity that carries permit to practice in the province of Newfoundland and Labrador.


P-A2541 Vacuum Priming System Issue Date:07/10/2018
Award Date:03/27/2019
Status:Awarded +

P-A2541 | Vacuum Priming System

Awarded to: KSP Pumps
Website:

SCOPE OF SUPPLY

The scope of supply shall include the design, fabrication, performance testing and delivery to site of the following:

a) 1 off vacuum skid, complete with, local control panel, air receiver and two (2) vacuum pumps in a duty standby arrangement as well as all appurtenances required for safe and effective operation.
b) 2 off vacuum priming valves (supplied loose)
c) 2 off water traps (supplied loose)
d) Detailed design and configuration of control interfaces with the ICS to ensure the communication of all necessary status, alarm, and control signals to enable remote control capability of the vacuum system via the ICS.
e) Mechanical completion and detailed factory acceptance testing of all equipment and devices, including system integration tests to test the interface with the ICS.
f) Completion of a detailed documentation package covering the full scope of supply.
g) Site assistance in Argentia, NL for the purposes of supporting installation, testing and commissioning.

The work shall be completed in accordance with the Regulatory requirements of the C-NLOPB and in compliance with Canadian and recognized International Codes and Standards.


P-A2540 Deballasting Pumps Issue Date:07/10/2018
Award Date:03/12/2019
Status:Awarded +

P-A2540 | Deballasting Pumps

Awarded to: KBS Pumps
Website:

SCOPE OF SUPPLY
The scope of supply shall include the design, fabrication, performance testing and delivery to site of the following:

a) 2 off 100% duty electro-submersible deballasting pumps suitable for seawater duty with a minimumrated flow 350m3/hr at 136m head and a minimum NPSHr of less than 8m (not necessarily at rated flow rate)
b) Air tight pump caissons fabricated from carbon steel.
c) Completion of a detailed documentation package covering the full scope of supply.
d) Factory acceptance testing of the pumps installed within their caissons at the vendors works.
e) Site assistance in Argentia, NL for the purposes of supporting installation, testing and commissioning.

The work shall be completed in accordance with the Regulatory requirements of the C-NLOPB and incompliance with Canadian and recognized International Codes and Standards.


P-A2308 Fabrication of Steel Components (Anode Skids / Conductor Guide No. 6 Panels) Issue Date:07/11/2018
Award Date:09/05/2018
Status:Awarded +

P-A2308 | Fabrication of Steel Components (Anode Skids / Conductor Guide No. 6 Panels)

Awarded to: Cahill Fabrication Structual
Website:

• Fabrication of the Anode Skids
• Supplied Type 1 Anodes to be attached.
• Conductor Guide Level No. 6 Panels
NOTE: SDP will supply the steel for the items above unless otherwise stated.


S-A8035 Disability and Claim Management Services Issue Date:07/26/2018
Award Date:10/01/2018
Status:Awarded +

S-A8035 | Disability and Claim Management Services

Awarded to: Dallas Mercer Consulting
Website:

The successful proponent must provide comprehensive disability claims management. The following items are required to be provided, but by no means are limited to:

OVERALL PROCESS & COMMUNCIATION

• Meet with sick/injured employees, union representatives, and supervisors, as necessary;
• Collaborate with Site Medical Team, site managers, and unions to meet obligations in the Return to Work process;
• Consult with Health Care Providers;
• Communicate with WorkplaceNL, medical providers and client to ensure cases are progressing;
• Complete and manage documentation.

MEDICAL SERVICES REFERRALS & MANAGEMENT

• Provide objective and independent disability claims management, by not being associated with any medical or health care provider;
• Must, however, have close and professional relationships with the local health care providers in the service area and for referrals;
• Organize Independent Medical Evaluations and medical referrals and diagnostics, as necessary and appropriate.

RETURN TO WORK/JOB FUNCTION

• Where necessary, review job task analysis to determine functions of work;
• Use functional information to create successful Return to Work plans;
• Monitor Return to Work plans, providing updates to client as appropriate;
• Assess accommodations and issues that arise from those accommodations;
• Implement Return to Work processes in accordance with provincial WorkPlaceNL regulations and company policies where multiple trades are involved;
• Communicate the Return to Work process to employees and management, while supporting the needs of managers/supervisors.

LEGISLATIVE/WORKPLACE

• Must have experience in complex disability claims cases in a multiple union, major construction project environment;
• Have knowledge to work with multiple unions to ensure client fulfills its obligations for WorkPlaceNL Return to Work and Human Rights legislation;
• Must have a deep and wide understanding of the provincial WorkPlaceNL workers’ compensation legislation, policies, and procedures;
• Must be well experienced in the Workers’ Compensation objection and appeal processes and, when appropriate, file objections or represent the client in the internal and external appeals process through application of its experience and intimate knowledge of WorkplaceNL legislation and policies;

• Review PRIME monthly cost statements and detailed health care statement to ensure accuracy and accountability.


P-A2314 Supply of Marine Appurtenances 650T Station Keeping Bracket (Steel Casting) Issue Date:08/07/2018
Award Date:11/30/2018
Status:Removed +

P-A2314 | Supply of Marine Appurtenances 650T Station Keeping Bracket (Steel Casting)

This package has been removed.

The Scope of Supply includes:

1) Supply of Marine Appurtenances, Station Keeping System Brackets (Steel Castings) 650 T including pins (forged stainless steel). Four (4) required.

Note, the PT bars and associated hardware are not included in this supply scope.
2) Supply of Pins (forged stainless steel) for 230 T Mooring/Towing Brackets. Thirty-Five (35) required.


P-A2315A Supply of Marine Appurtenances Tension Bars and Accessories Issue Date:08/07/2018
Award Date:05/22/2019
Status:Removed +

P-A2315A | Supply of Marine Appurtenances Tension Bars and Accessories

This package has been removed.

The Scope of Supply includes:

1) Supply of Prestressing (PT) bars and accessories, for 650 T Station Keeping System Brackets. Thirty-two (32) bars required. Accessories include end caps, bearing plates plastic ducts, grout pipes/vents etc.

2) Supply of 66 mm diameter Prestressing (PT) bars, for 230 T Station Keeping System Brackets. One-hundred and ninety-two (192) required. Accessories include end caps, bearing plates, plastic ducts, grout pipes/vents etc.


P-A2316 Marine Appurtenances Fabrication – 230T Mooring/Towing Brackets Issue Date:08/07/2018
Award Date:01/16/2019
Status:Removed +

P-A2316 | Marine Appurtenances Fabrication – 230T Mooring/Towing Brackets

This package has been removed.

The Scope of Supply includes:

1) Fabrication and Supply of Marine Appurtenances, Mooring/Towing Brackets 230 T. Thirty Four (34) required.

Note, the supply of PT bars and associated hardware is not included in this supply scope.

Note, the supply of forged pins is not included in this supply scope.


P-A2316A Marine Appurtenances Fabrication – 230T Mooring/Towing Brackets Issue Date:12/09/2018
Award Date:03/10/2019
Status:Awarded +

P-A2316A | Marine Appurtenances Fabrication – 230T Mooring/Towing Brackets

Awarded to: RothLochston Subsea Ltd
Website:

Scope of Work:

1) Fabrication and Supply of Marine Appurtenances, Mooring Bollards 230TE, Twenty-Six (26) required.

2) Fabrication and Supply of Marine Appurtenances, Mooring Ballads 13TE, Six-Teen (16) required.

3) Fabrication and Supply of Marine Appurtenances, Towing Forks, Four (4) required.

Note, the supply of PT bars and associated hardware is not included in this supply scope.

Note, the supply of forged pins is not included in this supply scope.


P-A2508 Pipe Supports including Coating Issue Date:12/09/2018
Award Date:02/06/2019
Status:Awarded +

P-A2508 | Pipe Supports including Coating

Awarded to: Rothlochston
Website: http://rothlochston.com/

Fabrication of Pipe Supports including Coating


P-A2519 Supply of Basket Strainers Issue Date:12/09/2018
Award Date:05/31/2019
Status:Awarded +

P-A2519 | Supply of Basket Strainers

Awarded to: Talon Energy Services
Website: http://www.talonenergyservices.ca/

Supply of Basket Strainers:
2 each of 16″, and 2 each of 12″


P-A2542 Temporary Water Pump Spec Issue Date:01/28/2019
Award Date:03/22/2019
Status:Awarded +

P-A2542 | Temporary Water Pump Spec

Awarded to: Pumps Plus
Website:

This package covers the supply, design, and fabrication of temporary water pump skid for the water distribution system.
Pump system shall consist of three variable speed centrifugal pumps connected, in parallel, to a common header, operated in a lead-lag-lag configuration by a single controller. The entire pump system including pumps, pump logic controller and structural skid, shall be designed, built, and tested by the same manufacturer. Pump system is to be delivered to site ready for piping and electrical connections.
All pumps shall be ANSI NSF 61 / NSF372 Listed for drinking water and low lead requirements.
• Flow rate: 44 L/s (22 L/s per pump).
• Total dynamic head: 635 kPa.
• Minimum available suction pressure: 140 kPa.
• Triplex system with 50% on lead pump and 50% on each lag pump.
• Inlet/outlet size: Six inch (4”).
Fabricator is to provide the pump fabricated on a skid complete with lifting lugs and rigging.
Delivery of pump skid shall be to the CGS Graving Dock, Argentia, NL, Canada.


S-A2540 Coatings Application service Issue Date:02/11/2019
Award Date:04/26/2019
Status:Awarded +

S-A2540 | Coatings Application service

Awarded to: Talon Energy Services
Website:

To provide minor services for coatings application to decks assembled for the CGS and other areas as needed. There will be no requirement for blasting. To be able to provide all QC inspections and reporting to our Quality department. The paint spec is a corrosion Protection.


P-A2317 Supply of Smit Brackets, Panama Chocks, and Chafe Chain Adaptors Issue Date:02/12/2019 Award Date:04/22/2019 Status:Closed +

P-A2317 | Supply of Smit Brackets, Panama Chocks, and Chafe Chain Adaptors

1) Supply of Smit Brackets, 650 metric tonne (Te) Minimum Breaking Load (MBL). Eight (8) required.
2) Supply of Panama Chocks, 650 Te MBL. Eight (8) required.
3) Supply of Chafe Chain Adaptor Assemblies. Eight (8) required.
Base plates for the Smit Brackets and Panama Chocks are not included in this supply package. The Smit Brackets and Chocks will be welded to the base plates (supplied by SDP) at Site.


P-A2720 Misc. Electrial and Lighting CGS Issue Date:02/11/2019 Award Date:04/30/2019 Status:In Progress +

P-A2720 | Misc. Electrial and Lighting CGS

Misc. Electrial and Lighting CGS


P-A2510B (Actuated Valves) Valve Actuation System Issue Date:07/10/2018
Award Date:04/30/2019
Status:Awarded +

P-A2510B (Actuated Valves) | Valve Actuation System

Awarded to: TechnipFMC Canada Ltd
Website:

The scope of supply shall include the detailed engineering, procurement, fabrication, commissioning, preservation, and supply of the ballast system valves fully outfitted with the electric actuators and the Valve Control and Monitoring System (VCMS). The following is included:

a) Supply of ballast valves complete with ISO 13628-8 class 4 mechanical interface for mounting the actuators.
b) Final selection and sizing of electric actuators.
c) Detailed design and configuration of VCMS local control panel operator interface screens to monitor and control the ballasting valves.
d) Detailed design of the VCMS, including redundant control system for the electric actuators, local control panel, and marshalling system to accommodate the transition from subsea rated cables from the actuators to the marine cables connecting to the VCMS cabinet.
e) Detailed design and configuration of control interfaces with the ICS to ensure the communication of all necessary status, alarm, and control signals to enable remote control capability of the ballasting valves via the ICS.
f) Procurement of all equipment and materials as required for the supply of the ballast valves, actuators, and VCMS cabinet.
g) Mechanical completion and detailed factory acceptance testing of all equipment and devices, including system integration tests to test the interface with the ICS.
h) Completion of a detailed documentation package covering the full scope of supply.
i) Site assistance in Argentia, NL for the purposes of supporting installation, testing and commissioning.

The supply of the Valve Control and Monitoring System and electric actuators may be incorporated within the ICS scope of supply if the bidder has the capability to offer an integrated solution.

The work shall be completed in accordance with the Regulatory requirements of the C-NLOPB and in compliance with Canadian and recognized International Codes and Standards.

Engineering design shall be performed by an entity that carries permit to practice in the province of Newfoundland and Labrador.

VALVE ACTUATION EQUIPMENT

The Valve Actuation equipment shall include the following items:

a) Subsea rated electric valve actuators for all actuated CGS ballasting valves, approximate quantities as per Table D1.
b) Supply of actuated and non-actuated valves (full bore ball valves and triple offset (TOS) butterfly type), approximate quantities as per Table D1.
c) Valve Control and Monitoring System cabinet(s) containing the local control panel HMI, ICS interface, and redundant actuator controllers, power supplies, and communications.
d) Marshalling system for the transition between subsea cable system and the VCMS cabinet.
e) Subsea cabling, connectors and junction boxes for installation between the actuators and the marshalling enclosure(s)


P-A8053 Fabrication and supply of steel formwork Issue Date:06/11/2019
Award Date:08/14/2019
Status:Awarded +

P-A8053 | Fabrication and supply of steel formwork

Awarded to: Talon Energy Services
Website:

The formwork for large curved concrete roof panels is currently being designed. When the design is complete, a package will be tendered for fabrication.

The Scope of Supply Includes:
– 2 sets of forms for a panel which is approximately 8m x 10m in plan
– 2 sets of forms for a panel which is approximately 8m x 11m in plan
– The forms will consist of multiple sub-panel assemblies that can be screwed/bolted together so that small adjustments can be made to the casting dimension.
– Forms will be curved, with welded stiffeners and supports
– Material will be Steel Grade 300W to CSA G40.20/G40.21
– Welding will be CSA W59
– Supply of Material and Welding Certifications


P-A2805 Life Raft & Launching System for CGS Issue Date:07/09/2019
Award Date:10/15/2019
Status:Awarded +

P-A2805 | Life Raft & Launching System for CGS

Awarded to: K&D Pratt Group Inc.
Website:

The scope of supply shall include:

1. Engineering and design services as per the requirements covered by this
specification.
2. Supply, fabrication, testing, certification, and delivery of the following equipment
for temporary use on the West White Rose Project (WWRP) Concrete Gravity Structure (CGS):
A. Life Raft and Launching System
B. Global Marine Distress and Safety Systems (GMDSS)

The items listed above and all their associated components, parts, sub-parts, and
appurtenances fall within the scope of this package.


P-A2809 Temporary Refuge Specification Issue Date:07/12/2019
Award Date:11/07/2019
Status:Awarded +

P-A2809 | Temporary Refuge Specification

Awarded to: Pennecon Hydraulic Systems
Website:

The scope of supply shall include the following:

1. Engineering and design services as per the requirements.

2. Supply, fabrication, testing, certification, and delivery of the following equipment for temporary use on the West White Rose Project (WWRP) Concrete Gravity Structure (CGS):

• One (1) climate-controlled TR, complete with sleeping quarters, washroom facilities, heating, ventilation, lighting, fire detection and extinguishing equipment, small power outlets, and other equipment and hardware required for a fully outfitted and self-contained refuge.
• All cables, cable support systems, cable glanding and terminations, and other hardware required to fully interconnect all of the above noted equipment within the TR.

3. Installation and testing of the following free issued equipment:

• One (1) Emergency Communication panel to be installed in TR, containing one (1) telephone and two (2) PAGA systems for CGS.
• One (1) UHF/VHF emergency communication radio system, including externally mounted antenna to allow communication with support vessels associated with WWRP and personnel onboard CGS with VHF radios.
• Fire detection system including ceiling mounted smoke detectors and interface panel.


P-A2811 Shaft Manway Door Issue Date:07/05/2019
Award Date:11/05/2019
Status:Awarded +

P-A2811 | Shaft Manway Door

Awarded to: Walz and Krenzer, Inc.
Website:

The scope of this package includes the technical requirements, critical submittals and
testing required for watertight doors including:

– Frame or coaming
– Door panel assembly
– Hinges
– Gasket
– Locking mechanism & handwheels
– Confirmation of closure sensors
– Leakage detection sensors

The items listed above and all their associated components, parts, sub-parts, and
appurtenances fall within the scope of this package.


P-A2812 Top of the Shaft Crane Issue Date:07/12/2019
Award Date:09/26/2019
Status:Awarded +

P-A2812 | Top of the Shaft Crane

Awarded to: Hawboldt Industries Ltd
Website:

The scope includes the technical requirements for a Marine Rated Crane including:

A. Pedestal & boom
B. Winch and rigging, including hook.
C. Hydraulic power unit and drives
D. Operator controls
E. Safety Devices

Other considerations:

1. Installation & Commissioning is excluded from the scope of the vendor.
2. Design Life of 5 years and Cranes will operate outdoors in harsh environment.

The items listed above and all their associated components, parts, sub-parts, and appurtenances fall within the scope of this package.


P-A2813 CGS Ventilation Fan and Ductwork Issue Date:07/02/2019
Award Date:09/23/2019
Status:Awarded +

P-A2813 | CGS Ventilation Fan and Ductwork

Awarded to: Alscott Air System Ltd
Website:

The scope includes the technical requirements for the shaft ventilation system including:
1. Engineering and design services as required to detail, size, specify, select and interconnect the equipment and systems listed below, and as per the requirements.

2. Supply, fabrication, testing, certification, and delivery of the following equipment for temporary use on the WWRP CGS:

a. One ventilation skid, complete with:
i. Ventilation fans and motors
ii. Base or frame suitable for offshore lift
iii. Smoke and gas detection

b. Other ventilation equipment, including:
iv. Flexible ductwork
v. Fittings
vi. Backdraft preventing dampers

Installation & commissioning by others


P-A2543 Supply and Fabrication of Temporary Water Pump Skid for Conical Slip Issue Date:07/05/2019
Award Date:10/29/2019
Status:Awarded +

P-A2543 | Supply and Fabrication of Temporary Water Pump Skid for Conical Slip

Awarded to: PumpsPlus Ltd.
Website:

This package covers the supply, design, and fabrication of temporary water pump skid
for the conical slip water distribution system. Delivery of pump skid shall be to the CGS Graving Dock, Argentia, NL., Canada.

Pump capacity: Flow rate: 3.8 L/s (1.9 L/s per pump)
Total dynamic head: 1380kPa
Minimum available suction pressure: 140kPa

Fabricator is to provide the pump fabricated on a skid complete with lifting lugs and
rigging. Contractor to provide pricing and supply schedule, based on a monthly rental
rate, half-year rental rate and a purchase price.


P-A2545 Seawater Circulation Opening Issue Date:07/26/2019
Award Date:10/29/2019
Status:Awarded +

P-A2545 | Seawater Circulation Opening

Awarded to: Canada Fittings & Flanges
Website:

Design, supply, fabrication, testing, certification, and delivery of four (4) Seawater Circulation Opening Plugs with complete documentation package. All associated components, parts, and appurtenances will be part of this scope and collectively referred as Plugs. Installation in the scope of others.


P-A2521 Fabrication and Supply of Lower External Ladders & Platforms Issue Date:08/09/2019
Award Date:11/21/2019
Status:Awarded +

P-A2521 | Fabrication and Supply of Lower External Ladders & Platforms

Awarded to: RothLochston
Website:

This scope of work includes:

Fabrication and Supply of the External Ladders and associated walkways required at designated perimeter Circumferential Wall (PCW), Caisson Circ. Wall (CCW) and Radial wall (RW) locations as per references 9 through 15.


P-A2522 Supply and Fabrication of External Ladders and Landings (Upper CGS) Issue Date:09/06/2019
Award Date:01/16/2020
Status:Awarded +

P-A2522 | Supply and Fabrication of External Ladders and Landings (Upper CGS)

Awarded to: C&W Offshore
Website:

This scope of work includes:

Supply and Fabrication of the Upper External Access Ladders and Landings per project specifications and design drawings.


P-A2536 Fabrication of MMO Marine Appurtenances Chafe Protection Issue Date:08/16/2019
Award Date:10/31/2019
Status:Awarded +

P-A2536 | Fabrication of MMO Marine Appurtenances Chafe Protection

Awarded to: Pennecon Fabrication
Website:

Fabrication of the Chafing protection required at the edge of the Base Caisson Roof and
at the Panama Chock Marine Appurtenances locations.


S-A2120 Hydro-testing of Ballast Piping and Caissons Issue Date:09/23/2019 Award Date:12/16/2019 Status:In Progress +

S-A2120 | Hydro-testing of Ballast Piping and Caissons

Piping will be installed on the CGS, and as part of Mechanical Completion, will require hydro-testing while insitu in the Graving Dock in Argentia. The Hydro-testing Vendor scope of work will include the transportation and supply of all equipment, procedures, documentation, materials and personnel to safely supervise craft to perform the hydro-testing of the following lines:

ASME A333 CSA B31.3 Class 150psi
2” Vacuum Priming piping ~ 200m
12” Deballast Pump suction piping ~ 2 x 4m
10” Deballast Pump discharge piping ~2 x 22m
6” Ballasting Low flow piping ~ 2 x 2m
6” Caisson Vent piping ~ 24 x 1m
12” Caisson Inlet/outlet piping ~ 24 x 20m
12” Shaft Inlet/outlet piping ~2 x 5m
16” Ballasting Ring main piping ~2 x 60m + 3 x 20m

CAN/CSA Z 19902 API 5L X52 (PSL2) Class 150psi
32” Fire Water Pump Caisson ~ 3 x 65m
20” Seawater Lift Pump Caisson ~3 x 82m
24” Seawater Return Caisson ~3 x 82m
24” Seawater Caisson ~115 m
24” Drilling Cutting Chutes~ 2 x 82m
12” Overboard Discharge Caisson ~46m

120/208/600V Power and fresh water will be supplied, as well as office space for two supervisory staff per shift and a place to store containers for equipment near by the work front.
Vendors must demonstrate past experience in similar scope, competent supervision, calibration of equipment, preparation of the required documentation for safety, quality, execution and sign off. Vendors may suggest cost and time saving opportunities for the execution of the scope as long as they fall within the quality and safety guidelines, and must be able to take into consideration an environmentally acceptable plan for preventing freezing during the hydro testing process and disposal of the water and any required additives.


S-A8056 Concrete Repairs Rope Access Issue Date:09/19/2019
Award Date:12/19/2019
Status:Awarded +

S-A8056 | Concrete Repairs Rope Access

Awarded to: Tacten Industrial Inc.
Website:

Scope of work:

1. Remove and install roof corbel brackets
2. Measurements on deep embeds
3. Patching/epoxy that is missed or is hard to get access to
4. Tape removal/plug removal from bolt holes on embeds
5. Shoulder bolts for stair tower tie ins/bolts for access brackets
6. Removal of the auxiliary jack brackets from the slip
7. Help columns that are pinned between the quadrants from the 11m drop
8. Painting of Draft Marking


P-A2325 Cast-In Rebar Guides Issue Date:01/06/2020
Award Date:02/20/2020
Status:Awarded +

P-A2325 | Cast-In Rebar Guides

Awarded to: Talon Energy Services
Website:

Prefabricated structural steel frames which will be cast in the concrete during the conical shaft slipform. The rebar guides will ensure that rebar installation tolerance is maintained during slipforming specifically as the shape of the shaft wall changes.


P-A2330 Top of Shaft Corbel Soffit Support Steel Issue Date:01/06/2020 Award Date:02/10/2020 Status:In Progress +

P-A2330 | Top of Shaft Corbel Soffit Support Steel

Prefabricated structural steel space frames which will be used to support the soffit of the deck connection corbels and top ring beam. The frames are required for installation prior to the start of jump forming.


P-A2313C Supply of Riser Pull in Winch and Sheaves Issue Date:01/24/2020 Award Date:03/10/2020 Status:In Progress +

P-A2313C | Supply of Riser Pull in Winch and Sheaves

Rental of Equipment and installation aids for pull-in operations for the flowline and umbilical risers for West White Rose Project in Newfoundland, Canada. Potential equipments required will be 50 Te Pull Capacity Winch with mandatory emergency breaking system and associated horizontal & Vertical Sheaves, HPU, Load Cells to monitor the winch wire tension, etc. Rental period is expected to be 2-3 months in the fall of 2020.

The vendor may be required to provide technical assistance during assembly & erection of equipments.


P-A2337 Tower Crane Ties Issue Date:02/14/2020
Award Date:03/17/2020
Status:Awarded +

P-A2337 | Tower Crane Ties

Awarded to: Cahill Fabrication
Website:

Tower Crane Ties as per attached.


P-T5101 Fabrication of Girderstar Replacement Components Issue Date:03/14/2022
Award Date:05/06/2022
Status:Awarded +

P-T5101 | Fabrication of Girderstar Replacement Components

Awarded to: Cahill Fabrication
Website: www.cahill.ca

Scope of Work:
Fabrication and coating of steel members. Members include truss-shaped assemblies from HSS, and beam assemblies.

SDP will supply majority of stock steel members (12m sections) and plates (varying dimensions). Any additional materials will be as per drawings and approved by SDP.

The scope of work includes:
• Fabrication and Coating of 208 Intermediate Girder Assemblies, a steel truss-like girder assembly welded from HSS members.
o 144 of L=2796 assemblies, 27.3te total
o 64 of L=1398 assemblies, 6.4te total
• Fabrication and coating of 133 Bracing Beam Assemblies, HEA/HEB beams varying from 1m to 10m in length, with plates welded to web and flange
o Various lengths, 35te total
• Fabrication and coating of 3 Gangway Beam Assemblies and 2 Bearing Beam Assemblies, each consisting of HEA beams with miscellaneous steel welded
o 8m and 3m lengths, 2.1te total
• Blasting and coating of existing carbon steel assemblies as follows:
o 1ea Center Piece (custom channel and beam assembly), 3.0te
o 288ea Pipe (1.05m, 1.65m, and 2.25m lengths), 1.0te
o 58ea Deck Beams (1.7m to 4.3m various lengths C-Channels and HSS), 4.1te
o 128ea Channel (5m to 8m various lengths C-Channels), 5.6te
• Materials to be welded are Euronorm S355, S235, and S275 carbon steel. Some instances of Carbon Steel to 1.4305 Stainless Steel.
• Construction to CSA S16.1, welding to W47.1
• Supply of Welding certifications
• Blasting and Coating system may vary between components, but will meet requirements of 24+month life in high corrosive environment.

Responses to this EOI posting will register individual companies with the Project. Companies who have previously registered or been pre-qualified on the CGS are asked to please respond to ensure inclusion on the Bidders List. To meet schedule, SDP will entertain joint venture proposals at the RFQ stage.

EOI Registration Deadline: COB March 14, 2022


P-T5102 Fabrication of Single Lift Platform Issue Date:09/07/2022
Award Date:11/14/2022
Status:Awarded +

P-T5102 | Fabrication of Single Lift Platform

Awarded to: C&W Offshore
Website:

Preamble
SDP is requesting interested parties to submit prequalification documents for the supply of steel, fabrication and delivery of road transportable sections of the Single Lift Platform (SLP).

Description of Single Lift Platform.
The SLP is a structural steel platform that will house the ballast equipment for the White Rose CGS during transportation and installation of the CGS to the offshore installation site.
The platform is approximately 15 m wide and 33 m long and primary girders consists of two fabricated built up girders 1500 mm deep running North South and 10 built up girders 1000 mm deep running East West. Primary girders and lift points will be notch tough CV material, all secondary and tertiary steel will be rolled NT material. The total tonnage of the platform will be approximately 126 tonnes.

Scope of Work:
Supply of all NT materials for fabrication. Fabrication of complete SLP structural deck in road transportable sections that can be assembled into the completed deck in Argentia. Fabrication includes the construction of all primary built up girders and assembly of secondary and tertiary steel including structural supports, lifting points, FRP grating and handrails to project specifications. Scope include blast and paint to project specifications.

Material Supply
SDP will supply (free issue) all CV material for the fabrication of the primary girders. All other materials shall be supplied by vendor.

Mandatory Requirements
Interested parties must demonstrate the following.
1. Approved weld procedures for CV materials

Responses to this EOI posting will register individual companies with the Project. Companies who have previously registered or been pre-qualified on the CGS are asked to please respond to ensure inclusion on the Bidders List. To meet schedule, SDP will entertain joint venture proposals at the RFQ stage.

EOI Responses to be forwarded to Megan Clarke ([email protected])


S-A8062 Recruitment Agency Services Issue Date:10/04/2022 Award Date: Status:In Progress +

S-A8062 | Recruitment Agency Services

Scope of Work:
Hiring and staffing is an essential task for a company as it plays a huge part in over-all performance of the business. Companies need personnel with different skills and talents for various positions. SDP is seeking a third party recruitment agency that is able to work with us to fill various positions that are difficult due to market constraints.

The agency must be able to offer services that can effectively do the following:
• Source, attract and hire the right talent quickly according to SDP’s needs, such as, but not limited to, seek the perfect talent based on their unique requirements, including industry, discipline, location, prior roles and more.
• Ability to provide a huge number of applicants in a short period.
• Ensure the provider’s ability to assign a dedicated recruitment consultant that focuses on and has technical expertise, knowledge, flexibility, and resources in specialty areas so they truly understand the roles and challenges in our industry, which enhance the process and better quality outcome is obtained.
• Access advanced analytics and reporting to provide status of recruitment.
• Build and nurture a pipeline of suitable candidates and provide feedback.
• Scale resources up or down to align with demand.
• Dedicated recruitment consultant must have experience in recruitment of candidates for heavy civil and construction projects in the area of staff personnel.
• Thoroughly interview and assess prospective applicants and matching them to vacancies prior to forwarding to SDP.
• Screening candidates and drawing up shortlist of candidates for SDP to interview.
• Organizing interviews and selection events.
• Assist in helping applicants to prepare for interviews.
Responses to this EOI posting will register individual companies with the Project. Companies who have previously registered or been pre-qualified on the CGS are asked to please respond to ensure inclusion on the Bidders List. To meet schedule, SDP will entertain joint venture proposals at the RFQ stage.

EOI Responses to be forwarded to [email protected]


General Fabrication Services General Fabrication Services Issue Date:02/09/2023 Award Date: Status:In Progress +

General Fabrication Services | General Fabrication Services

SNC-Lavalin-Dragados-Pennecon (SDP) invites interested parties to submit an Expression of Interest (EOI) for general fabrication services as part of the West White Rose Project. These services are chiefly towards the supply of temporary works components and materials (and some ad hoc permanent materials should they arise) for the CGS currently under construction at the Argentia, NL site.
SDP requires the services of qualified and experienced contractors to include the following:

• Fabrication of various project components
• Supply of materials for fabrication
• Delivery to the Argentia, NL job site

Interested parties may be subject to technical/experience audits, quality audits and or safety assessments for the purposes of validating programs and procedures

Closing date of this expression of interest is February 16 at 2:00pm NL Time

EOI Responses to be forwarded to [email protected]


P-T5109 Fixed Mast Aerial Work Platform Issue Date:09/29/2023
Award Date:02/27/2024
Status:Awarded +

P-T5109 | Fixed Mast Aerial Work Platform

Awarded to: Sky Climber
Website: https://skyclimber.com/

Scope of Work:
Supply of fixed mast aerial work platform which will meet all of the parameters specified. In addition to the supply of the unit, successful bidder will be required to provide on site training detailing the proper setup, take down and day to day maintenance and use of the equipment. Training can be conducted on an as needed basis or preferably provide a “train the trainer” program which will allow us to train our personnel as required.

Vendor may be required to come to site to perform repairs and maintenance as required/recommended during the life of the unit.

See attachment for more information on the scope of work.

EOI Responses to be forwarded to [email protected].

↓ Download Package Information
S-A8077 Transportation of Riser Reels Issue Date:11/08/2023
Award Date:03/20/2024
Status:Awarded +

S-A8077 | Transportation of Riser Reels

Awarded to: Mammoet Canada Eastern Ltd
Website: https://www.mammoet.com/

SDP is requesting expressions of interest to provide transportation services to transport five (5) Subsea Riser Reels from the dock at the Port of Argentia to the CGS Construction site in Argentia.

Scope of Work
The transportation will require the use of multi axle Self-Propelled Modular Transporters (SMPT) or similar to transport the reels. The weight of the reels range from 45 tonnes to 86 tonnes and have an overall dimensions of 8 meters in diameter by 5 meters in width.

The Riser Reels are scheduled to arrive in Argentia Late March/Early May 2024.
EOI Submittal Deadline

Responses to this EOI posting will register individual companies with the Project.

EOI Responses to be forwarded to [email protected]

EOI Registration Deadline: COB November 8, 2023

Projected Award Date: COB February 15, 2024

↓ Download Package Information
P-A2313C Riser Pull-in Winch and Equipment Issue Date:02/13/2024
Award Date:04/10/2024
Status:Awarded +

P-A2313C | Riser Pull-in Winch and Equipment

Awarded to: Pennecon Hydraulic Systems Ltd.
Website:

Scope of Work:
Supply (Rental or Purchase) of Riser Pull-in Winch for the installation of Riser in the Concrete Gravity Structure (CGS) for West White Rose Project at Argentia Construction Site in Newfoundland (NL), Canada.

The supply shall satisfy the requirements, which will be stated in the drawings and West White Rose Specifications to be issued with the Bid Package. All EOI respondents will be given the opportunity to submit a proposal through a Request for Quote (RFQ) and will receive the full Bid Package.

Project Location:
The West White Rose Platform is being constructed in a Graving Dock in Argentia, NL, Canada
https://maps.app.goo.gl/LDRn1m886xyxyeQQ6

See attachment for more information on the scope of work.

EOI Responses to be forwarded by email to Procurement Team at [email protected]

↓ Download Package Information
P-A2827 Supply of Davit Cranes Issue Date:02/22/2024
Award Date:04/22/2024
Status:Awarded +

P-A2827 | Supply of Davit Cranes

Awarded to: Equipment Corps
Website: https://www.equipmentcorps.com/

Scope of Work:
Supply only of two (2) Marine rated Davit Cranes including pedestals, Winch & Rigging, operator control and safety devices in accordance with Project Specification – Handling Davit Technical Specification WH-F-89W-M-SP- 00018-001 E1.

The supply shall satisfy the requirements, which will be stated in the West White Rose Specifications to be issued with the Bid Package. All EOI respondents will be given the opportunity to submit a proposal through a Request for Quote (RFQ) and will receive the full Bid Package.

Project Location:
The West White Rose Platform is being constructed in a Graving Dock in Argentia, NL, Canada

https://maps.app.goo.gl/LDRn1m886xyxyeQQ6

See attachment for more information on the scope of work.

EOI Responses to be forwarded by email to Procurement Team at [email protected]

↓ Download Package Information
P-A2828 Supply of Safety and Life Saving Equipment Issue Date:03/28/2024
Award Date:04/12/2024
Status:Awarded +

P-A2828 | Supply of Safety and Life Saving Equipment

Awarded to: Source Atlantic Limited & Brogan Fire & Safety
Website:

Scope of Work:
Supply of Safety and Life Saving Equipment for the installation on Concrete Gravity Structure (CGS) for West White Rose Project at Argentia Construction Site in Newfoundland (NL), Canada and these are for use during CGS tow & installation phase and then removed.

The supply shall satisfy the requirements, which will be stated in the “Safety and Life Saving Equipment Specification” to be issued with the Bid Package. All EOI respondents will be given the opportunity to submit a proposal through a Request for Quote (RFQ) and will receive the full Bid Package.

Project & Delivery Location:
The West White Rose Platform is being constructed in a Graving Dock in Argentia, NL, Canada.

https://maps.app.goo.gl/LDRn1m886xyxyeQQ6

See attachment for more information on the scope of work and Confidentiality Agreement.
Companies will be required to sign the Confidentiality Agreement for the Project, if not signed previously.

EOI Responses to be forwarded ONLY by email to Procurement Team at [email protected]

EOI Registration Deadline changed to COB March 28, 2024.

↓ Download Package Information
P-A2831 Rental of Work & Rescue Boats Issue Date:04/30/2024 Award Date:05/13/2024 Status:In Progress +

P-A2831 | Rental of Work & Rescue Boats

Scope of Work:

Rental of Work & Rescue Boats for the West White Rose Project at Argentia Construction Site in Newfoundland (NL), Canada. The approximate rental period is July 2024 to April 2025.

The rental shall satisfy the requirements to be stated in the “Work & Rescue Boats Specification” to be issued with the Bid Package. All EOI respondents will be given the opportunity to submit a proposal through a Request for Quote (RFQ) and will receive the full Bid Package.

Project & Delivery Location:
The West White Rose Platform is being constructed in a Graving Dock in Argentia, NL, Canada.
https://maps.app.goo.gl/LDRn1m886xyxyeQQ6

See attachment for more details on the Scope of Work.

EOI Responses to be forwarded ONLY by email to Procurement Team at [email protected]

EOI Registration Deadline: COB April 30, 2024

↓ Download Package Information
P-T5111 Supply of Floating Docks and Gangways Issue Date:04/30/2024 Award Date:05/28/2024 Status:In Progress +

P-T5111 | Supply of Floating Docks and Gangways

Scope of Work:

Supply of Floating Docks and Gangways required for Dry Dock Flooding and Access Operations anticipated to begin in August 2024 for the West White Rose Project at Argentia Construction Site in Newfoundland (NL), Canada.

The supply shall satisfy the requirements to be stated in the attached “Specification” to be issued with the Bid Package. All EOI respondents will be given the opportunity to submit a proposal through a Request for Quote (RFQ) and will receive the full Bid Package.

Project & Delivery Location:
The West White Rose Platform is being constructed in a Graving Dock in Argentia, NL, Canada.
https://maps.app.goo.gl/LDRn1m886xyxyeQQ6

See attachment for more details on the Scope of Work.

EOI Responses to be forwarded ONLY by email to Procurement Team at [email protected]

EOI Registration Deadline: COB April 30, 2024

↓ Download Package Information
P-T5112 Sale of Combination Trailer Units Office (CE) Issue Date:04/30/2024
Award Date:05/21/2024
Status:Removed +

P-T5112 | Sale of Combination Trailer Units Office (CE)

This package has been removed.

Scope of Work:

SDP has a combination trailer unit office for sale as per attached drawing. This office is comprised of 9 individual 12’x60’ trailers, combined to form an office building of 108’x60’. This office building has offices around is perimeter and is open concept in the interior for cubicles. This office has;
– A full kitchen and dining room area
– A large multi-unit restroom and 2 individual restrooms
– Remotely controlled electric baseboard heating and HVAC with AC.
– Large porch area
– Mini-split cooling in electrical room and 1 board room
– 200amp/600V current electrical supply (Can be converted 120/240V with new drop)
– Office on cribbing, not axles
– Complete fire alarm system installed
– Purchased new and assembled in 2018

The office will be dismantled and separated by SDP into its individual 12’x60’ trailer units prior to sale with electrical rolled back to the trailer with the electrical room, and the open walls will be sheeted in for transport.

All EOI respondents will be given the opportunity to submit a proposal through a Request for Quote (RFQ) and will receive the full Bid Package.

Project Location:
The West White Rose Platform is being constructed in a Graving Dock in Argentia, NL, Canada
https://maps.app.goo.gl/LDRn1m886xyxyeQQ6

EOI Responses to be forwarded by email to Procurement Team at [email protected]

EOI Registration Deadline: COB April 30, 2024

↓ Download Package Information
S-A8081 Heavy Equipment Rental Issue Date:06/21/2024 Award Date: Status:In Progress +

S-A8081 | Heavy Equipment Rental

Scope of Work:
Supply of Heavy Equipment (on a Rental Basis) required for Bund Wall Removal and Dredging Support anticipated to begin in July 2024 to December 2025 for the West White Rose Project at Argentia Construction Site in Newfoundland (NL), Canada.
All EOI respondents will be given the opportunity to submit a proposal through a Request for Quote (RFQ) and will receive the full Bid Package.
Heavy Equipment Rental – Brief Summary Specification:
The supply of Heavy Equipment required for construction activities including Bund Wall Removal and Dredging Support. Reference attached equipment listing outlining the quantity and duration.
Rental equipment to include registration, inspection certificates, maintenance reports and operating procedures.
Project & Delivery Location:
The West White Rose Platform is being constructed in a Graving Dock in Argentia, NL, Canada.
https://maps.app.goo.gl/LDRn1m886xyxyeQQ6
Qualification Criteria:
Bidders interested in participating in the tender process are required to provide past experience for the supply of similar items.
They will also be required to sign a Confidentiality Agreement for the Project, if not signed previously.
Schedule: ROS Date is July 15, 2024
Responses to this EOI posting will register individual companies with the Project. Companies who have previously registered or been pre-qualified on the CGS are asked to please respond to ensure inclusion on the Bidders List. SDP reserves the right to split the scopes of work and award to multiple bidders. To meet schedule, SDP will entertain joint venture proposals at the RFQ stage.
EOI Responses to be forwarded ONLY by email to Procurement Team at [email protected]
EOI Registration Deadline: COB June 21, 2024

↓ Download Package Information
S-A8082 Helicopter Lift Services Issue Date:06/21/2024 Award Date: Status:In Progress +

S-A8082 | Helicopter Lift Services

Scope of Work:
Supply of Helicopter Lift Services required for CGS (Concrete Gravity Structure) activities anticipated to begin in October 2024 to March 2025 for the West White Rose Project at Argentia Construction Site in Newfoundland (NL), Canada.
All EOI respondents will be given the opportunity to submit a proposal through a Request for Quote (RFQ) and will receive the full Bid Package.
Helicopter Lift Services – Brief Summary Specification:
The supply of helicopter services for the purpose of lifting in a construction environment having the capability of lifting a wide range of materials and equipment safely and transporting to or placing with precision. Equipment cable to be included for specialized lifts.
Project & Delivery Location:
The West White Rose Platform is being constructed in a Graving Dock in Argentia, NL, Canada.
https://maps.app.goo.gl/LDRn1m886xyxyeQQ6
Qualification Criteria:
Bidders interested in participating in the tender process are required to provide past experience for the supply of similar items.
They will also be required to sign a Confidentiality Agreement for the Project, if not signed previously.
Schedule: ROS Date is October 1, 2024
Responses to this EOI posting will register individual companies with the Project. Companies who have previously registered or been pre-qualified on the CGS are asked to please respond to ensure inclusion on the Bidders List.
EOI Responses to be forwarded ONLY by email to Procurement Team at [email protected]
EOI Registration Deadline: COB June 21, 2024

↓ Download Package Information
S-A8084 Auction Services Issue Date:07/26/2024 Award Date: Status:In Progress +

S-A8084 | Auction Services

Package: S-A8084 Auction Services for the Sale of Surplus Material at the End of Project

The SNC-Lavalin, Dragados and Pennecon GP (SDP), is the Contractor for the Construction of Concrete Gravity Substructure (CGS) for the West White Rose Project (WWRP) in Newfoundland Canada.

SDP invites you to submit your interest to participate in the bidding process for providing Auction Services in Newfoundland and Labrador, Canada for the sale of Surplus material & equipment available at the end of the Project. The Intent of this EOI is to reach out to all Auctioneers and Auction Houses who might be interested to provide their services.

The items planned for auction may include construction related consumables and tools, heavy equipment, office furniture and equipment, etc.

Project Location:
The West White Rose CGS is being constructed in a Graving Dock in Argentia, NL, Canada

https://maps.app.goo.gl/LDRn1m886xyxyeQQ6

All EOI respondents will be given the opportunity to submit a proposal through a Request for Quote (RFQ) and will receive a detailed Package.

Please submit your EOI Responses by email to Procurement Team at [email protected] with cc to Sandeep Jagota, Senior Contracts Administrator at [email protected]

EOI Registration Deadline: COB July 26, 2024
Projected Award Date: August 2, 2024

↓ Download Package Information